Snow removal contract pricing
Your inputs
Complete only the fields for your selected method. Use one consistent job or reporting period. Use zero for a known zero amount only when the field permits it. Missing costs and market rates are not added automatically. Currency selection labels amounts; it does not convert exchange rates.
How this calculation works
visit cost = person-hours × labor rate + equipment-hours × equipment rate + material units × unit cost + travel; season cost = visits × visit cost + overhead; quote = cost / (1 − margin)
Visit count and time are your planning assumptions. To price one visit, enter one visit and only the fixed costs allocated to it. The estimate supplies no weather forecast, deicer dosage, service trigger or contract interpretation. Use your own records for the same scope and period. Example figures are illustrative, not industry benchmarks. Results exclude income taxes and any cost you have not entered. Check the result before pricing work or committing resources.
What information do I need?
Use records for the same job, equipment or accounting period. Only the fields for your selected entry method are required. An unknown amount is not zero.
Input definitions and where to find them
- Planned visits in the quoted season (visits): Use the matching measured quantity, time log, schedule or clearly stated estimate. Zero means intentionally none; an unknown amount is not zero.
- Person-hours per visit (hours): Use the matching measured quantity, time log, schedule or clearly stated estimate. Zero means intentionally none; an unknown amount is not zero.
- Loaded labor cost per person-hour (selected currency): Use a supplier quote, invoice, payroll record or allocated cost for the exact job or period named here. Include this amount only once.
- Equipment hours per visit (hours): Use the matching measured quantity, time log, schedule or clearly stated estimate. Zero means intentionally none; an unknown amount is not zero.
- Equipment cost per hour excluding labor (selected currency): Use a supplier quote, invoice, payroll record or allocated cost for the exact job or period named here. Include this amount only once.
- Material units budgeted per visit (units): Use the matching measured quantity, time log, schedule or clearly stated estimate. Zero means intentionally none; an unknown amount is not zero.
- Cost per material unit (selected currency): Use a supplier quote, invoice, payroll record or allocated cost for the exact job or period named here. Include this amount only once.
- Other cost per visit including travel not entered above (selected currency): Use a supplier quote, invoice, payroll record or allocated cost for the exact job or period named here. Include this amount only once.
- Allocated fixed cost for the season (selected currency): Use a supplier quote, invoice, payroll record or allocated cost for the exact job or period named here. Include this amount only once.
- Target margin on the quoted price (%): Enter a percentage from your records or an explicitly chosen scenario. No typical or recommended rate is supplied.
Use the Where to find this value controls beside the inputs for available work-it-out helpers. Estimates remain your assumptions; a helper does not verify the source figures.
Worked example
Example amounts use US dollars (USD).
Example answer: Modeled quote before sales tax is $5,333.33 for the illustrative inputs below.
Example inputs
- Planned visits in the quoted season: 12 visits
- Person-hours per visit: 3.00 hours
- Loaded labor cost per person-hour: $35.00
- Equipment hours per visit: 2.00 hours
- Equipment cost per hour excluding labor: $65.00
- Material units budgeted per visit: 2.00 units
- Cost per material unit: $20.00
- Other cost per visit including travel not entered above: $25.00
- Allocated fixed cost for the season: $400.00
- Target margin on the quoted price: 25.00 %
- Modeled quote before sales tax
- $5,333.33
- Entered job cost
- $4,000.00
- Contribution after entered costs
- $1,333.33
- Entered variable cost per visit
- $300.00
- Average quoted price per planned visit
- $444.44
- The example is illustrative. This is not a market quote. Include all relevant costs; omitted costs are not added automatically.
These illustrative values are not recommended rates or industry averages. Replace every example input with your own figures.
Use the result well
Inputs come from your own records and stated assumptions; no rates or legal limits are looked up.
Review the entered assumptions and calculator limits before using these results. Have a qualified professional verify design and safety decisions.